Source summary · Developer statement
Amani Melasti — April 2026
- Prepared by
- AIREX
- Editorial responsibility
- AIREX
- Source published
- Record added to AIREX
This is an attributed summary of an external publication. Source statements and allegations are not AIREX verification findings.
TEUS reported Section 2’s second-floor slab and technical-level waterproofing complete. Section 3’s third-floor slab was complete, with structural work continuing across the project.
Original source
TEUS Group ↗Source language: EN
Related properties
Corrections and material changes
No correction is recorded. Earlier changes, if any, were not retrospectively reconstructed.
Substantive corrections keep the original source date and include a dated explanation and supporting sources. Report an error through AIREX and include this page URL.
Report an issue to AIREX →